Alinta would support regular reviews of the inclusion of coal-fired capacity.
10 June 2022
Solar panels to power up to 100% of daytime operations at Christmas Creek and Cloudbreak mine sites.
15 December 2021
Relying on its green power projects to do some of the heavy lifting.
16 June 2020
It realised the lack of an interconnected system a problem and set about fixing.
30 January 2020
Part of the solar-gas hybrid power project to replace diesel generation at FMG's Chichester.
21 October 2019
Agreement struck with Alinta Energy to develop gas-solar hybrid power solution.
18 October 2019
Deal turns old power station site into iron ore transhipment facility.
04 February 2019
A Q&A with Okane Consultants
SRK Consulting's Rob Bowell discusses mine closure and the valorization of mine waste.
Ecocene’s Ecoda powers smart, data-driven mine closure and ecosystem restoration
SES housing engineered for Australasia’s toughest applications
MMI Future Fleets Report 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions
Exclusive research for Mining Magazine Intelligence Automation and Digitalisation Report 2024 shows mining companies are embracing cutting-edge tech
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.