Hume Coal sought planning approval to extract approximately 50mt of run-of-mine coal over 23 years.
01 September 2021
Hume wants to use underground mining techniques to mine up to 3.5 million tonnes of coal each year.
25 August 2021
Meanwhile, the government is saying: "we're desperate and we need your business".
10 June 2021
The location of the mine and community concerns about impacts would require close attention.
28 May 2019
Written submissions were also able to be lodged to the IPC up until March 6.
12 March 2019
Finalist named for this year's Emerging Leader award.
11 March 2019
Project director Greig Duncan said Hume Coal welcomed the IPC public hearings.
27 February 2019
To help eliminate impacts on surface features and water resources, a non-caving method was proposed.
16 December 2018
New GET System Reduces Costs, Boosts Production at Sojitz's Bowen Basin Mine
MTG, specialist in the design and manufacture of high-quality wear solutions for mining machinery, is introducing the new VEEMET ROPE SHOVELS system, a new GET solution especially dedicated to rope shovels.
THE BEST GET BETTER: the new Nexsys system
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production