Acland Stage 3 is shovel ready and can provide long-term jobs now.
17 June 2020
New Acland Stage 3 was expected to generate $7 billion in economic activity over a 15 year minelife.
05 June 2020
Most of the steel and other recyclable material from the CHPP was selectively recovered.
03 June 2020
The Bengalla mine produced 1.7 million tonnes in the April quarter, which was 12.5% higher.
28 May 2020
Stephan had been at the company for 11 years, firstly as chief financial officer.
12 May 2020
If the Court finds in OCAA's favour, the Stage 3 application may be referred back for a rehearing.
23 April 2020
The proposed expansion of New Acland would increase production to 7.5Mtpa.
26 March 2020
New GET System Reduces Costs, Boosts Production at Sojitz's Bowen Basin Mine
MTG, specialist in the design and manufacture of high-quality wear solutions for mining machinery, is introducing the new VEEMET ROPE SHOVELS system, a new GET solution especially dedicated to rope shovels.
THE BEST GET BETTER: the new Nexsys system
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production