The stage 2 expansion created 700 temporary construction jobs and 300 full-time positions
11 October 2019
The weak lithium market kills off Tianqi's 2nd stage expansion plans at Kwinana.
12 September 2019
Delaying about 125,000tpa of lithium hydroxide processing capacity.
09 August 2019
Another player looking to enter WA's Lithium Valley.
11 June 2019
Providing pyro-processing and comminution equipment.
10 April 2019
WA keen to get itself further down the battery industry value chain.
31 January 2019
New GET System Reduces Costs, Boosts Production at Sojitz's Bowen Basin Mine
MTG, specialist in the design and manufacture of high-quality wear solutions for mining machinery, is introducing the new VEEMET ROPE SHOVELS system, a new GET solution especially dedicated to rope shovels.
THE BEST GET BETTER: the new Nexsys system
CAT equipment dealer Hastings Deering was established in 1932.
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production