An extension study on the proposal is well-advanced
16 January 2024
The pilot plant is scheduled to be built in Perth
14 August 2023
Toro hopes to cash in on growing demand for nuclear energy in Japan.
01 September 2022
Toro says Lake Maitland will be transformational for the value of Wiluna.
04 May 2022
Toro looks to vanadium to smooth the uranium path at Wiluna.
06 September 2019
Toro get good results from beneficiation and process design studies.
13 September 2018
Could lead to cost savings in processing plant build.
27 June 2018
Three female mining leaders honoured.
12 June 2018
New GET System Reduces Costs, Boosts Production at Sojitz's Bowen Basin Mine
MTG, specialist in the design and manufacture of high-quality wear solutions for mining machinery, is introducing the new VEEMET ROPE SHOVELS system, a new GET solution especially dedicated to rope shovels.
THE BEST GET BETTER: the new Nexsys system
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production