INTERNATIONAL COAL NEWS

Boulder Steel works through green hoops

QUEENSLAND coal companies and Western Australian iron ore miners can look forward to more domesti...

Blair Price

This article is 15 years old. Images might not display.

Key plant units of interest include blast furnace slag granulators and a pulverised coal injection coal facility.

Boulder is continuing to interact with raw material suppliers and the project is expected to source Australian coal and iron ore.

In its recent annual report, Boulder said preliminary steps were being made for a port access agreement with Gladstone Port Corporation.

Infrastructure for the project includes a rail loop and a coal unloading facility, plus an associated conveyor system to haul the coal to the stockyards.

The Australia-listed company is evaluating a shipping plan for the delivery of iron ore plus the export of its finished steel products.

The plans will cover berth requirements, berth design and support facilities.

Boulder said the EIS was progressing to the point where most of its sections were complete.

“The EIS will be finalised and lodged after the final plant design has been agreed with the joint venture consortium,” the company said.

“The Gladstone Steel Plant Project is an integral part of the highly significant industrial planning and development program in the Gladstone region.”

Last year Boulder Steel general manager and executive director Carl Moser told International Longwall News the first hot metal from the Gladstone plant was expected to be produced in 2013.

Bulk earthworks construction for the project was previously expected to take place in the last quarter of 2010.

In the first stage, the plant is intended to produce 2.1 million tonnes per annum of steel billets and blooms, while stage two will bring the total output to 5Mtpa.

Semi-finished steel products from the Gladstone plant will be shipped to another Boulder planned rail and heavy beam downstream processing facility in the industrial city of Al-Jubail in the Eastern Province of the Kingdom of Saudi Arabia.

Boulder plans to build the Gladstone and Saudi projects simultaneously.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions