INTERNATIONAL COAL NEWS

Margaret River project faces celebrity ridicule

ENGLISH comedians Ben Elton and Michael Palin have lifted the profile of the ongoing campaign aga...

Blair Price

Celebrity chef Ian Parmenter of Consuming Passions fame is leading residents’ activist group NO COAL!tion Margaret River and has no problem using his contacts from his years on television to advance the campaign.

A separate website, titled Margaret River SOS, has been established to get people to sign an online petition against the project.

Palin recently uploaded a video on You Tube to promote this website and air his concerns.

Elton, who owns land in the Margaret River region and spends around half of each year in Fremantle with his family, spoke at a campaign fundraiser at the Xanadu winery on Saturday.

He described the project as "an act of monumental, millennium-shaping stupidity”, as reported in the Augusta-Margaret River Mail.

Documentary filmmaker and former A Country Practice TV star Michael Muntz is behind an advertising campaign which will be launched against the project.

As the opposition to the project becomes more organised and sophisticated, Vasse coal project operator LD Operations is yet to get through the preliminary phases of greentape in the state.

LDO, a notable contractor which also owns the Chain Valley underground coal mine in New South Wales, submitted its first documents to WA’s Environmental Protection Authority back in November and is still awaiting a determination on the level of assessment that will be applied.

That level of assessment is also required for LDO to complete its scientific studies, modelling and detailed management plans, which will be publicly reviewed.

A determination is expected this week.

“Like everyone else, we’re keen to have the level of assessment set as soon as possible so we can start work on the studies needed to address the concerns of some residents,” LDO managing director Peter Ross previously told ILN.

The proposed mine will target the Osmington seam of the Sue coal measures, and will need approvals to source water, transport the raw coal to a planned wash plant by road and to transport the product thermal coal either domestically or for export.

Up to 225 operational jobs and up to 800 indirect jobs are expected to be created if the project goes ahead.

The draft underground mining plan is looking at a production rate of 1.2 million tonnes per annum for a mine life of 20 years.

The Vasse project is conservatively estimated to have resources of at least 116Mt, according to data provided by Intierra.

TOPICS:

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions