The recovery operation has not been without its challenges.
14 April 2021
The recovery team is focusing on the area about 2053m up the 2.3km drift.
19 November 2020
The Agency now expects it will most likely be possible to complete recovery work by August.
26 March 2020
The re-entry phase marks the second stage of the PRRA's planned objectives.
26 May 2019
The 2.3km drift tunnel had been sealed 30m from the portal entrance since November 2016.
22 May 2019
New GET System Reduces Costs, Boosts Production at Sojitz's Bowen Basin Mine
MTG, specialist in the design and manufacture of high-quality wear solutions for mining machinery, is introducing the new VEEMET ROPE SHOVELS system, a new GET solution especially dedicated to rope shovels.
THE BEST GET BETTER: the new Nexsys system
CAT equipment dealer Hastings Deering was established in 1932.
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production