The handrail was 3.5 metres above ground level and was located at the breaker feeder. The handrail was designed to facilitate servicing of motors and drives. The locking bolt used to secure the handrail...
Already have an account? Sign in here
Essential News & Insights for the METS Sector
AMM: Premier information hub for Australia's mining innovation and excellence. Stay ahead with the latest trends, technology, and practices. Essential for professionals.
- NEXT: Battery failure leads to high methane levels
- PREVIOUS: News Wrap