An open-cut pit shell was created based on a maximum 100m depth of cover for an average in situ strip ratio of 11.4 bank cubic metres per tonne. A contractor highwall mining operation with 300m...
Already have an account? Sign in here
Essential News & Insights for the METS Sector
AMM: Premier information hub for Australia's mining innovation and excellence. Stay ahead with the latest trends, technology, and practices. Essential for professionals.